Potomac Yard Land Bay C – East
Location
Explore the project site through a Virtual Walking Tour
The 2.03 acre (88,418 sq. ft.) site is the east parcel of Potomac Yard Land Bay C, located along Potomac Avenue between 29th and 33rd Street South in the Potomac Yard neighborhood. The site is bordered by 29th Street South (north), Potomac Avenue (east), 33rd Street South (south), and surface parking (west). The site is within the National Landing BID boundary.
Status
Under Review
This reports the status related to Site Plan Review Process only (Administrative Regulation 4.1).
About the Project
The applicant, ZMA Development, LP, proposes to develop the site (Land Bay C – East) with two mixed-use buildings and a portion of North Park Plaza. The application also includes proposed amendments to the existing Potomac Yard Phased Development Site Plan (PDSP) and final site plan for Land Bay C; to allow for an office to residential use conversion and to separate Land Bay C into discrete East and West site plans, respectively.
Additional project details include:
- New Site Plan (C-O-1.5 district):
- Two residential towers, with ground-level retail
- Building heights range from 11 to 14 stories proposed
- 488 total residential units
- 509,001 sq. ft. of residential GFA
- 9,181 sq. ft. of retail GFA
- 0.82 parking spaces per dwelling unit
- Two residential towers, with ground-level retail
- PDSP and Site Plan Amendment (SP #346)
- Allow for conversion of previously approved office GFA to residential GFA
- Separate Land Bay C into “East” and “West” final site plans
- Site Plan infrastructure and improvements include:
- Utility fund contribution
- Streetscape improvements
- Public art contribution
- Affordable housing contribution
- Public park improvements contribution
- LEED certification
Applicant Materials
September 24, 2020
- Application documents
- Preliminary TDM + MMTIA documents
- 4.1 Site Plan Drawings – Architecture |Civil |Landscape
- Preliminary Energy Model
Public Process
- This project will undergo public review via a virtual Site Plan Review Process. Learn more.
- The SPRC Chair for the site plan review process is: Stephen Hughes: stephenthughes@gmail.com
Timeline | Milestone / Meeting | Materials |
2020 | ||
November 20, 2020 | Site Plan Acceptance |
|
November 2020 | Site Plan Review Process Kick-off | |
December 17 - December 24, 2020 | Online Engagement Opportunity
Review Focus: land use, site design, building massing, architecture, sidewalks/streetscapes, transportation, and open space |
|
2021 | ||
February 1 | Virtual Site Plan Review Committee (SPRC) Meeting
Discussion Topics: Land Use, Site Layout, Building Design and Architecture |
|
March 1 | Virtual Site Plan Review Committee (SPRC) Meeting
Discussion Topics: Project updates, Transportation, Open Space, Community Benefits/Construction |
|
TBD | Transportation Commission Meeting
Public Hearing |
|
TBD | Planning Commission Meeting
Public Hearing |
|
TBD | County Board Meeting
Public Hearing
|
*Process timelines are subject to change as needs arise. Check back for updates.