North Nelson Street Outfall Improvement Project
Location of North Nelson Street outfall project
This project is part of the storm water drainage improvement located in the back and the rear portion of the property located at 2707 N. Nelson St.
Status
Complete
The project will begin construction on May 15, 2018 and complete construction by July 30, 2018.
About the Project
This project is part of the storm water drainage improvement projects located in the back and the rear portion of the property located at 2707 N. Nelson St. The existing storm pipes and outfall are in poor condition. Erosion is occurring at the outfall of the pipe.
The project will improve the storm water drainage system, reduce risk of erosion, and stabilize the outfall channel that leads to the Windy Run stream channel.
- The project includes installation of approximately 113 linear feet of 24- inch storm sewer pipe. The new system will improve and minimize the risk of erosion, practically around Windy Run Stream channel and drainage basin.
- There will traffic disruptions and some temporary sidewalk detours.
- Construction is expected to last approximately 2 months and half.
Inform
This project is an inform level of engagement.
Stormwater Fund
This project is funded by the Stormwater Fund.