Metropolitan Park 4/5
Location
Bounded by 12th Street South (to be constructed) to the north, S. Eads Street to the east, 13th Street South (to be constructed) to the south and S. Elm Street (to be constructed) to the west.
Status
Complete
The County Board approved the plan on July 13, 2013. Read the meeting minutes with approved site plan conditions (Item #42).
A Phased Development Site Plan Amendment was approved by the County Board on Dec. 10, 2016. Read the meeting minutes with approved site plan conditions (Item #3).
Check building permit status.
About the Project
The applicant, 1200 Eads St. Inc., proposes a final site plan for this 115,097-square-foot (2.64 acres) site to combine phases four and five of the Metropolitan Park development (phases as defined by the Metropolitan Park Design Guidelines).
Proposed project details:
- Construct one building consisting of 699 residential units and 41,679 square feet of retail space, with a grocery store comprising 37,058 square feet of the ground floor.
- The building will incorporate multiple rooflines with a maximum proposed height of 22 stories (260.7 feet).
- Request amendments to the Pentagon City PDSP (SP #105) and the County’s Master Transportation Plan.
In 2016, the applicant proposed to amend the Metropolitan Park Phase 4/5 Site Plan to permit temporary conversion of fifty remaining unleased apartment units in designated areas from residential use to hotel use.
Proposed amendment details:
- No more than fifty apartment units may be converted to hotel use at any time.
- The use is temporary: the conversion of apartment units to hotel use would only be permitted for a 24-month period following action by the County Board, so that all units must be converted back to apartment use at that time.
- Eligible units for conversion are limited to four identified floors of the building.
Project Materials
Applicant Materials
The Bartlett
- The Bartlett 4.1 Site Plan Application (Sept. 30, 2016)
- The Bartlett 4.1 Plans
Metropolitan Park 4/5
- Metropolitan Park Design Guidelines
- Metropolitan Park Design Booklet
- Metropolitan Park 4.5 Report (July 13, 2012)
- Metropolitan Park Appendix
- Metropolitan Park Supplemental Analysis Memo (Feb. 19, 2013)
Meeting Materials
The Bartlett
- Dec. 10, 2016 - County Board: Agenda (Item #3) | Board Report | Supplemental Report | Letter from the Planning Commission | Meeting Minutes
- Nov. 3, 2016 - SPRC: Staff Report | Staff Presentation
Metropolitan Park 4/5
- July 13, 2013 - County Board: Agenda (Item #42) |Board Report A-C | Planning Commission Letter | Letter from the Public | Board Report D | Supplemental Report (Revised Ordinance) | Meeting Minutes (Item #42)
- July 1, 2013 - PC: Staff presentation | Applicant Presentation
- April 18, 2013 - SPRC: Staff Presentation | Applicant Presentation
- April 1, 2013 - SPRC: Staff Presentation | Applicant Presentation | Meeting Summary
- March 11, 2013 - SPRC: Staff Presentation | Applicant Presentation | Meeting Summary
- Feb. 14, 2013 - SPRC: Applicant Presentation | Meeting Summary
- Jan. 24, 2013 - SPRC: Staff Presentation | Applicant Presentation | Meeting Notes
- Nov. 20, 2012 - SPRC: Staff Presentation | Applicant Presentation | Meeting Notes