Form Based Code Architectural Standards Review
In late March, County staff hosted a joint workshop as part of a periodic review reflecting on Form Based Code built results produced so far. The workshop also aimed to determine what, if any, amendments should be made to ensure we’re getting the highest quality architecture possible. Participating in this workshop were members of the Planning Commission, the Form-Based Code Advisory Working Group, the Columbia Pike Presidents Group and the Design Review Committee of the Historical Affairs and Landmark Review Board.
Participants were also asked to rate each project based on aesthetics and design. View the results.
Below are images of each project, as well as participants’ comments, organized by construction type and year.
Planning Contact
Matt Mattauszek
703-228-0493
Stick-Built Construction (4–6 stories)
2004 – 2005
2006 – 2008
2009
2010 – 2011
2012
2013
2014
2015
2016
Concrete Construction (7–9 stories)
2004 – 2005
2009 – 2013
2014 – 2016